Skid Sprayer Frame
China-to-Vietnam supply chain migration — completed in 10 months
The Challenge
Facing international trade uncertainty, a U.S. client needed to shift their Skid Sprayer Frame production from China to Vietnam. The critical requirement: a fully localized supply chain — all raw materials sourced within Vietnam — to completely eliminate tariff pressures and trade volatility.
1. Requirement Analysis & Factory Selection
We analyzed the customer's drawings, technical standards, and annual demand, then selected a Vietnam factory capable of providing an end-to-end local supply chain — from raw materials to finished goods.
Certificate of Origin for Raw Materials
2. Factory Visit & Capability Verification
Our on-the-ground team visited multiple suppliers and verified:
- • Production capacity for cutting, welding, and machining
- • Fixture preparation and welding consistency
- • Quality-control workflow and measurement tools
- • Production stability and delivery capability
3. On-Site Process Follow-Up
Our team embedded in the factory to monitor each production step — tube cutting, welding, and surface grinding — ensuring welding accuracy and dimensional requirements were met.
Tube Cutting
Tube Welding
Surface Grinding
4. Sample Inspection & Approval
Full dimensional inspection: welding flatness & penetration, tube alignment, hole distance & diameter accuracy, surface finish quality.
5. Mass Production & Delivery
With customer-approved samples, the factory scaled to mass production. All frames completed welding, grinding, QC checks, and packing — shipped on schedule.
Results
Complete supply chain transition — sourcing, engineering, and on-site QC aligned for a seamless China-to-Vietnam migration. The client now has a Section 301-exempt, fully Vietnamese supply chain for ongoing production.
Start Your Project →