Get Parts Faster —
Without the Tariff Hit
Vietnam manufacturing delivers comparable speed to China — but with 0% tariffs, shorter shipping routes, and no 145% surprise duties. Compare lead times across processes and see why buyers are moving East.
Faster Than China
Same production speed, but 2–3 weeks less shipping time. Air freight from Vietnam reaches the US in 3–5 days.
0% Import Tariffs
Most manufactured goods from Vietnam enter the US tariff-free. China imports face up to 145% duties — that cost adds up.
Door-to-Door Logistics
We handle export, customs, and delivery. You get a tracking number and an ETA — no freight forwarding headaches.
Lead Time Comparison by Process
Production lead times from order confirmation. Dewin times include quality inspection. Shipping to US shown separately below.
CNC Machining
💡 Vietnam air freight to US: 3–5 business days
Sheet Metal
💡 Includes laser cutting, bending, welding, and finishing
Injection Molding (Tooling)
💡 Production parts: 3–7 days after T1 approval
Die Casting (Tooling)
💡 Includes secondary machining and surface finishing
Stamping (Tooling)
💡 Progressive die and deep draw capabilities
Aluminum Extrusion
💡 Custom die creation included in lead time
Investment Casting
💡 Includes wax pattern tooling for first orders
Assembly
💡 Mechanical, electrical, and sub-assembly services
Vietnam → US Shipping Options
We manage logistics end-to-end. Choose the shipping method that fits your timeline and budget.
Air Freight (Express)
3–5 business days
Higher — best for prototypes & urgent orders
Air Freight (Standard)
5–8 business days
Moderate — good balance of speed and cost
Sea Freight (FCL)
18–25 days
Lowest — best for large production runs
Sea Freight (LCL)
25–35 days
Low — for smaller volumes not filling a container
Real-World Example: CNC Parts
From quote to parts on your dock — a side-by-side comparison.
Dewin (Vietnam)
US Domestic
China
* Lead times are estimates based on typical projects. Actual times vary based on complexity, material availability, and order volume. Contact us for a project-specific timeline.
Ready to Get Started?
Send us your drawings or 3D files. We'll get back with a detailed quote — including exact lead times for your specific parts — within 24–48 hours.