Lead Times

Get Parts Faster
Without the Tariff Hit

Vietnam manufacturing delivers comparable speed to China — but with 0% tariffs, shorter shipping routes, and no 145% surprise duties. Compare lead times across processes and see why buyers are moving East.

🚀

Faster Than China

Same production speed, but 2–3 weeks less shipping time. Air freight from Vietnam reaches the US in 3–5 days.

💰

0% Import Tariffs

Most manufactured goods from Vietnam enter the US tariff-free. China imports face up to 145% duties — that cost adds up.

📦

Door-to-Door Logistics

We handle export, customs, and delivery. You get a tracking number and an ETA — no freight forwarding headaches.

Lead Time Comparison by Process

Production lead times from order confirmation. Dewin times include quality inspection. Shipping to US shown separately below.

⚙️

CNC Machining

Dewin (Vietnam)
Standard 5–10 days
Expedited 3–5 days
US Domestic
Standard 15–25 days
Expedited 7–10 days
China + Shipping
Standard 15–20 days + 3–5 wks shipping
Expedited 7–10 days + 3–5 wks shipping

💡 Vietnam air freight to US: 3–5 business days

🔩

Sheet Metal

Dewin (Vietnam)
Standard 7–12 days
Expedited 5–7 days
US Domestic
Standard 15–30 days
Expedited 10–15 days
China + Shipping
Standard 10–15 days + 3–5 wks shipping
Expedited 7–10 days + 3–5 wks shipping

💡 Includes laser cutting, bending, welding, and finishing

🏭

Injection Molding (Tooling)

Dewin (Vietnam)
Standard 15–25 days
Expedited 10–15 days
US Domestic
Standard 6–10 weeks
Expedited 4–6 weeks
China + Shipping
Standard 20–35 days + 3–5 wks shipping
Expedited 15–20 days + 3–5 wks shipping

💡 Production parts: 3–7 days after T1 approval

🔥

Die Casting (Tooling)

Dewin (Vietnam)
Standard 20–35 days
Expedited 15–20 days
US Domestic
Standard 8–14 weeks
Expedited 6–8 weeks
China + Shipping
Standard 25–40 days + 3–5 wks shipping
Expedited 15–25 days + 3–5 wks shipping

💡 Includes secondary machining and surface finishing

🔨

Stamping (Tooling)

Dewin (Vietnam)
Standard 20–30 days
Expedited 12–18 days
US Domestic
Standard 8–12 weeks
Expedited 5–8 weeks
China + Shipping
Standard 20–30 days + 3–5 wks shipping
Expedited 15–20 days + 3–5 wks shipping

💡 Progressive die and deep draw capabilities

📏

Aluminum Extrusion

Dewin (Vietnam)
Standard 15–25 days
Expedited 10–15 days
US Domestic
Standard 6–10 weeks
Expedited 4–6 weeks
China + Shipping
Standard 15–25 days + 3–5 wks shipping
Expedited 10–15 days + 3–5 wks shipping

💡 Custom die creation included in lead time

🪨

Investment Casting

Dewin (Vietnam)
Standard 25–35 days
Expedited 18–25 days
US Domestic
Standard 8–14 weeks
Expedited 6–10 weeks
China + Shipping
Standard 25–40 days + 3–5 wks shipping
Expedited 18–25 days + 3–5 wks shipping

💡 Includes wax pattern tooling for first orders

🔧

Assembly

Dewin (Vietnam)
Standard 5–15 days
Expedited 3–7 days
US Domestic
Standard 10–20 days
Expedited 7–14 days
China + Shipping
Standard 5–15 days + 3–5 wks shipping
Expedited 3–7 days + 3–5 wks shipping

💡 Mechanical, electrical, and sub-assembly services

Vietnam → US Shipping Options

We manage logistics end-to-end. Choose the shipping method that fits your timeline and budget.

Recommended for Prototypes

Air Freight (Express)

3–5 business days

Higher — best for prototypes & urgent orders

Air Freight (Standard)

5–8 business days

Moderate — good balance of speed and cost

Sea Freight (FCL)

18–25 days

Lowest — best for large production runs

Sea Freight (LCL)

25–35 days

Low — for smaller volumes not filling a container

Real-World Example: CNC Parts

From quote to parts on your dock — a side-by-side comparison.

Dewin (Vietnam)

Quote24–48 hrs
Production5–10 days
QC & Packing1–2 days
Shipping (Air)3–5 days
Tariff0%

Total11–19 days

US Domestic

Quote2–5 days
Production15–25 days
QC & Packing1–2 days
Shipping2–5 days
TariffN/A

Total20–37 days

China

Quote1–3 days
Production7–15 days
QC & Packing1–2 days
Shipping (Sea)21–35 days
TariffUp to 145%

Total30–55 days

* Lead times are estimates based on typical projects. Actual times vary based on complexity, material availability, and order volume. Contact us for a project-specific timeline.

Ready to Get Started?

Send us your drawings or 3D files. We'll get back with a detailed quote — including exact lead times for your specific parts — within 24–48 hours.