What Is PPAP?

Production Part Approval Process (PPAP) is a standardized quality documentation framework defined by the Automotive Industry Action Group (AIAG). It gives customers documented proof that a supplier can consistently manufacture parts to engineering specifications before full production begins.

Originally developed for the automotive supply chain (Ford, GM, Stellantis), PPAP has been widely adopted in industrial machinery, medical devices, aerospace, and consumer electronics — any industry where part quality consistency is critical.

For US buyers switching production from China to Vietnam, PPAP serves a dual purpose: it verifies the new supplier's process capability and provides the origin documentation trail needed for Section 301 tariff compliance.

Why PPAP Matters for Overseas Sourcing

  • Confirms the supplier's process — not just their samples — can hit your specs
  • Establishes a quality baseline before mass production
  • Provides documented evidence for your internal supplier qualification
  • Creates the paper trail for country-of-origin verification
  • Reduces risk of receiving non-conforming parts at scale
  • Required by most Tier 1 and OEM supplier quality manuals

PPAP Submission Levels 1–5

AIAG defines five submission levels. The customer specifies which level is required. Level 3 is the industry standard for new supplier relationships.

Level 1

PSW Only

Part Submission Warrant only, no supporting documentation submitted to customer.

When to use: Established supplier relationships, non-critical commercial parts, repeat reorders.

Low verification
Level 2

PSW + Limited Documents

PSW plus product samples and a subset of supporting documentation.

When to use: Moderate-risk parts, existing supplier new part number.

Moderate verification
Level 3

PSW + Full Package

Complete PPAP package submitted to the customer for review and approval.

When to use: Most new supplier relationships. Industry standard starting point for new overseas suppliers.

Full verification
Level 4

PSW + Customer-Specific

Customer defines specific elements required beyond the standard package.

When to use: Customers with unique quality requirements, aerospace/defense applications.

Custom verification
Level 5

Full Package at Supplier

Complete package reviewed at the supplier's manufacturing location.

When to use: Safety-critical parts, automotive Tier 1 supply, first-article at factory.

On-site verification
Dewin Recommendation: For all new Vietnam supplier relationships, request Level 3 PPAP. This gives you the full documentation package without requiring an on-site visit. For safety-critical or automotive parts, require Level 5 and Dewin will coordinate the on-site review at the Vietnam factory.

All 18 PPAP Elements

A complete Level 3 PPAP package contains all 18 elements below. Dewin's team reviews each element at the Vietnam factory before submitting to you.

1

Design Records

Engineering drawings, CAD data, and design specifications that define the part.

2

Engineering Change Documents

Documentation of any engineering changes with authorization.

3

Customer Engineering Approval

Signed approval from customer engineering for design deviations or concessions.

4

Design FMEA

Failure Mode and Effects Analysis covering design-level failure risks.

5

Process Flow Diagrams

Step-by-step manufacturing process from raw material to finished part.

6

Process FMEA

FMEA covering manufacturing process failure risks and detection methods.

7

Control Plan

Document listing all process controls: measurement systems, frequency, reaction plans.

8

Measurement System Analysis (MSA)

Gauge R&R and calibration studies proving measurement tools are capable.

9

Dimensional Results

Balloon drawing with all dimensions checked and recorded. Typically 5 initial samples.

10

Material / Performance Test Results

Material certificates (certs of conformance), hardness, tensile, or functional test data.

11

Initial Process Studies

Process capability (Cpk, Ppk) studies on critical characteristics. Cpk ≥ 1.67 preferred.

12

Qualified Laboratory Documentation

Proof that test labs are accredited (ISO 17025 or equivalent).

13

Appearance Approval Report (AAR)

For visible parts: color, gloss, surface texture sign-off with customer.

14

Sample Production Parts

Physical parts produced from the production process (not prototype tooling).

15

Master Sample

A retained reference part signed off by customer and supplier.

16

Checking Aids

Any fixtures, gauges, or templates used for inspection — documented and approved.

17

Customer-Specific Requirements

Any additional requirements from the customer's supplier quality manual.

18

Part Submission Warrant (PSW)

The summary document — signed by both parties — that formally approves the part for production.

Critical Element #18 — Part Submission Warrant (PSW): The PSW is the legal sign-off document. Both your authorized representative and the supplier's authorized representative must sign it. No PSW = no PPAP approval, even if all other elements are complete. Dewin facilitates PSW execution for every new Vietnam supplier.

PPAP + Tariff Savings by Process

Moving each process from China to Vietnam eliminates Section 301 tariffs — and requires a new PPAP submission. Dewin manages both.

Process HTS Chapter China Tariff Vietnam Tariff PPAP Key Documents
CNC Machined Parts 8466.93 / 8466.94 25% $0 Full dimensional results (CMM/VMM), material certs, process capability
Aluminum Die Castings 7616.99 25% $0 Die casting process FMEA, metallurgy cert, dimensional report
Injection Molded Plastics 3926.90 25% $0 Mold flow data, material certification, AAR (if visible), Cpk study
Steel Stampings 7326.20 25% $0 Tooling FMEA, dimensional results, material cert (mill cert), Cpk on critical dims
Electronic Assemblies 8536.50 25–145% $0 Component traceability, IPC workmanship, functional test records
Forged Parts 7326.11 / 8483.10 25% $0 Die design review, heat treatment certs, mechanical properties testing, Cpk

Tariff rates reflect Section 301 (China-specific) under the Trade Act of 1974. Vietnam-origin goods are not subject to Section 301. Verify current rates at USTR.gov.

How Dewin Manages PPAP for Vietnam Suppliers

Our on-the-ground team in Vietnam handles the full PPAP process — so you get documentation-ready parts without having to chase a factory overseas.

PPAP-Capable Factory Matching

Dewin matches your parts to Vietnam factories that have PPAP experience — particularly those supplying automotive Tier 1/2 manufacturers. We verify PPAP capability during our 50-point Dolphin audit.

Documentation Management

Our on-the-ground team in Vietnam reviews and compiles PPAP packages — dimensional results, material certs, process flow, FMEA, control plan — before submission to you. No chasing suppliers for paperwork.

First Article Inspection (FAI)

We run balloon drawings against first-article samples at the factory. CMM or 2D VMM dimensional results are captured on-site and included in your PPAP package.

Country-of-Origin Documentation

Every PPAP package includes Vietnam origin documentation — manufacturer declarations and Certificate of Origin. Critical for Section 301 tariff compliance: proves your parts are Vietnam-origin, $0 tariff.

Tariff Change Trigger Response

Moving production from China to Vietnam triggers a PPAP re-submission requirement. Dewin manages the full new-supplier PPAP as part of your China+1 transition — no gaps in documentation.

Ongoing PPAP Maintenance

Any engineering change, tooling repair, or process change at the factory triggers a PPAP update (ECN). Dewin monitors factory changes and initiates re-approval when required — protecting your supply chain from silent quality drift.

PPAP + Dolphin Audit: Two Layers of Confidence

Dewin's 50-point Dolphin Audit assesses the factory's baseline capability. PPAP documents that a specific part has been approved for production. Together, they give you maximum confidence before committing to volume production.

50-Point Dolphin Audit

  • Factory-level assessment (equipment, processes, quality systems)
  • 5 pillars: Equipment, Quality, Management, Capacity, Compliance
  • On-site visit with real photos and video evidence
  • QCLDM score out of 100 (≥70 required to enter Dewin network)
  • Applied to all 179+ factories before they enter our network
Learn about the Dolphin Audit →

PPAP Documentation

  • Part-specific approval (this exact part, this exact factory, this exact process)
  • 18 elements: dimensional results, material certs, FMEA, control plan, PSW
  • Process capability data (Cpk, Ppk) on critical characteristics
  • Managed by Dewin's on-ground team at the Vietnam factory
  • Includes Vietnam country-of-origin documentation (CO + manufacturer declaration)
View our quality standards →

PPAP FAQ

What is PPAP and why does it matter for overseas sourcing?

PPAP (Production Part Approval Process) is an AIAG-standardized process that verifies a supplier can consistently manufacture a part to your engineering specifications. For overseas sourcing, PPAP is critical because it provides documented evidence — dimensional reports, material certs, process capability studies — that a new factory can hit your specs before full production begins. It dramatically reduces the risk of receiving non-conforming parts at scale.

Can Vietnam factories provide PPAP documentation?

Yes. The best Vietnamese factories — particularly those supplying automotive Tier 1 and Tier 2 manufacturers — produce full PPAP packages including dimensional results, material certifications, process flow diagrams, FMEAs, control plans, and PSW. Dewin's 179+ audited factory network includes factories with PPAP experience. Our team manages the documentation process and reviews every package before it reaches you.

What PPAP level should I require from a new Vietnam supplier?

For a new overseas supplier relationship, Level 3 PPAP is the most common starting point — it requires the full package to be submitted to the customer. For critical automotive or safety parts, some customers require Level 4 (specific items defined by customer) or Level 5 (reviewed at supplier location). For non-critical commercial parts from a qualified, audited supplier, Level 1 (PSW only, no documentation submission) may be acceptable for reorders.

How does moving production from China to Vietnam affect PPAP?

Any change in manufacturing location — including moving from China to Vietnam — typically triggers a new PPAP requirement. This is because PPAP is process- and facility-specific: it documents that a specific factory with specific equipment can consistently make your part. Dewin manages this PPAP re-submission as part of the supplier transition process, ensuring full documentation is in place before production begins.

Does sourcing from Vietnam affect PPAP tariff compliance?

Yes — and positively. Vietnam-origin parts are not subject to Section 301 tariffs (China-specific under the Trade Act of 1974). A PPAP from a Vietnamese supplier includes country-of-origin documentation that supports your customs compliance and demonstrates genuine manufacturing in Vietnam — critical for avoiding tariff reclassification risk.

Ready to Source from Vietnam with Full PPAP Documentation?

Dewin manages PPAP for 179+ audited Vietnam factories — plus $0 Section 301 tariffs on every part. Get a quote and we'll confirm PPAP capability for your process.